
(1) Follow the cable preparation procedures outlined in "F" MALE Connector
to Port for both drop cables.
(2) Install shrink sleeve onto one of the two prepared drop cables and
position it far enough down the cable to allow for connection.
(3) Install the "F" connectors according to manufacturer's specifications
onto each respective cable. Secure both connectors to the F/81 Female Splice
Adapter.
(4) With a slight twisting and pushing motion, slide the shrink sleeve
up and over the connectors and F/81 adapter, centering the sleeve directly
over the F/81. Installation is now complete.
Back